October 26, 2026CommoditiesStocks·Bullish·mining
Li-FT Power reports first assay results from Adina-Galinée lithium drill program
Li-FT Power Ltd. released assay results for the first five of 45 drill holes from its 2026 summer drilling campaign at the Adina-Galinée Lithium Project, covering 13,403.5 metres of core. A highlight intercept of 56 metres grading 1.43% Li2O was reported in drill hole ALP002.
Detected & updated continuously · Source: Nebula
Story subjects
Li-FT PowerAdina-Galinée Lithium Project