SpaceX confirms chip factory with 1 terawatt annual compute target
SpaceX confirmed Thursday a chip factory with a 1 terawatt annual compute target, revealed in a launch schedule hidden in its offering materials. The compute target implies 10 million tonnes to orbit per year based on 100 kW of orbital compute per tonne.
Detected & updated continuously · Source: Nebula
Story subjects
Sources
@shanaka86
Hidden inside the chip factory SpaceX confirmed Thursday is a launch schedule. If you divide its 1 terawatt annual compute target by the 100 kilowatts of orbital compute per tonne in SpaceX's own offering materials and you get 10 million tonnes to orbit a year. That exact figure https://t.co/uQguTPXiNx
@cb_doge
SpaceXAI shipped 114 Grok Build releases in just 83 days. • May: 17 releases — v0.1.209 → v0.2.16 • June: 54 releases — v0.2.20 → v0.2.79 • July: 39 releases — v0.2.80 → v0.2.118 • August: 4 releases — v0.2.119, v0.2.120, v0.2.121 & v1.0.0 That’s an average of 1.37 https://t.co/BibI85LFXp